Live-In Accommodation - Moem

Overview

The Moem Barracks (Wewak) live-in accommodation project will improve the standard of living and operational capability of the Papua New Guinea Defence Force (PNGDF) through construction of a new 100-person live-in accommodation (LIA) block and associated supporting services. Upgrades to services will focus on improving energy and water security for the building and wider base population. Works commenced in October 2022 the LIA component is forecast for completion in December 2023.


Location

Wewak, Papua New Guinea


Client

Department of Defence


Value

$9M


Contract Type

Design & Construct


 

Construction cost savings of over $2 Million due to value engineering and innovative methodologies to deliver a low maintenance and cost-effective solution to the Commonwealth. Our modification of the design concept to modular construction, shortened the program by 17%.

 

Kind Words

“The LIA was built for occupation of the Papua New Guinea Defence Force. It consisted of a two-story modular container facility in a remote and international location. Key requirements included low maintenance, durability, energy efficiency, and a replicable design. Throughout design and construction, CC Pines Pty Ltd continuously strived to provide services above and beyond these requirements. CC Pines Pty Ltd value-added to the scope of works and built a facility that has enhanced the living conditions of the Papua New Guinea Defence Force.”

SJ Atkinson
Project Engineer
19th Chief Engineer Works

 
 